Day FIFTEEN

Back from the weekend camping trip!

I did not get as much done last week as planned. I wanted to get up all the insulation and vapor barrier, but realized halfway thru the east wall that I needed to run my gang boxes and electric wire first. That required purchasing a new drill bit set for boring the wood in the frame to run the electric holes. So got all that set up and ready to go.

Plans for today:

  1. install all electric boxes in the walls and ceilings.
  2. run the wiring and staple it down, leaving enough for the circuit box (don't want to do that myself).
  3. run the cable and phone lines as well.
  4. finally insulate and vapor the east/north walls.

That's it for today.

PICTURES the next morning - 5 angles (3 from door, 2 from window), click to enlarge:

Previous Day || Home || Next Day

Contact Me with questions or comments about this web site or for a quote.

Design by Chuck HomeBasement RemodelContact UsSitemapPut-in-Bay ResortPut-in-Bay Island Guide

Design by CKR