Day SEVENTEEN

This is a catch-up day. Lots of small tasks can be done to get ready to erect the west wall.

I had originally planned to do the vapor barrier the other day and some insulation, but decided I should run the electric, cable, and phone first so that it hides behind the insulation (duh!).

Plans for today:

  1. put up a roll of insulation to complete the east/north/water-stub walls. One piece extra can be slapped up over on the south wall.
  2. put up the 2x2 "header" board along the south wall to nail up the ceiling drywall to on that corner.
  3. measure and prepare the 14' boards for installation tomorrow.

notes: found that I need to buy more staples for staple gun, more wire guard plates, and maybe another roll of insulation. Also need to figure out how big the door opening will be so I can cut the 14' boards.

PICTURES the next morning - 5 angles (3 from door, 2 from window), click to enlarge:

Previous Day || Home || Next Day

Contact Me with questions or comments about this web site or for a quote.

Design by Chuck HomeBasement RemodelContact UsSitemapPut-in-Bay ResortPut-in-Bay Island Guide

Design by CKR