Day EIGHTEEN

This is the day that the west wall begins! Let it rise! This will be done around a trip to downtown to pour beer for the Masons as a fundraiser.

I bought a phone terminal for 4 extensions that I think I will install before the electric box gets roughed out.

Plans for today:

  1. measure and mark the the 14' header/footer boards for west wall.
  2. install telephone splitter.

notes: the door rough in is 32 1/2" by 82" for a 30x80 door. Also, the cinder block wall or the stairwell wall is off kilter as the measurements are 201 1/2" for the top plate length, and 202" for the bottom plate length.

NO PICTURES!

Previous Day || Home || Next Day

Contact Me with questions or comments about this web site or for a quote.

Design by Chuck HomeBasement RemodelContact UsSitemapPut-in-Bay ResortPut-in-Bay Island Guide

Design by CKR